Membership
{}
Search
Quick Links
Voice of Public
House Sale/Rent in BB/BS
Location
Shopping
Where to get
Fastmail
Vision Bukit Beruntung
Bukit Beruntung to become the preferred Residential Community that is
Multiracial & in Harmony
Safe & Peaceful
Rich with natural beauty
Rich with essential facilities of a modern 21st
Maintained with high standards
Ahli Jawantankuasa PKPBB
Pengerusi:
Augustine Maria Dasan

Naib Pengerusi
David KH Lim

Setiausaha:
K.H Jacob
Naib Setiausaha:
Jagadeban Thuraisingham

Bendahari
Chong Siek Chew

AJK 
Rozliham bin Ali
Purushottaman Gengadaram
Zahid Ariffin Idrus
Pathinaidu Genganaidu
Manivanan  Muniandy
Salim Bin Johir
Advertisement
 
 
 

1.  Excessive Development

•  Has MDHS taken steps to stop any futher developement in BB,since there are alot 
   of empty houses unoccupied which had caused major maintenance issues?

•Has MDHS taken steps to take actions to house owners which have abandoned their houses and had 
no maintained their houses in reasonable conditions?

 

 

•  Poor coordination & handover between Developer & MDHS

Is the handover of BB Township from the Developer to MDHS complete?
Which are the areas that have been handed over to MDHS?
Which areas are still outstanding?
•  When is the deadline to complete the handover of the outstanding areas?
 
  Poor Water Quality
•  Water Quality is poor (see Water Filter) 

Source of Treated Water? 
Where is the source of the Treated Water?Several of the reservoirs are not operational

Irregular Water Supply 
Water supply had been disrupted at-least 3 times in the last 2 months. 

Water Leaks 
Pipe leakage near the Main Road will damage the road. 
 

  Stagnant water damaging road surface because side table is at a higher level than the road

Surface runoff not efficiently & quickly channelled to main drains ( Main Road , Jalan Melur etc.), causing minor flood during heavy rain. This is a safety hazard to road users & destroys the roads

  Irregular Maintenance & Poor Quality Repairs

Road Repairs at the Main Road & Jalan Melur were done poorly. Road Repair lasted for less than 2 months in front of the old Guard House and roughly 7 months at Jalan Melur. Also, potholes in the Industrial Zone were not repaired timely, which are safety hazards to the road users.

Provision of traffic lights

  When is the deadline for the traffic light to the Industrial Zone to be constructed?

Irregular maintenance of streetlights

Street Lights is some areas are not operationall

Frequent disruption to power supply

Power Supply to Bukit Sentosa had been disrupted on several occassions

Frequent disruption to power supply

Power Supply to Bukit Sentosa had been disrupted on several occassions

Electric poles not installed in certain areas

Some areas still do not have fixed telephone line facility